Extension of time limit for obtaining of Annual Verification (Life) Certificates upto 15.04.2021- Instructions

Attention of all the Deputy Directors of District Treasuries in the state and ATO, AP CRT, Ibrahimpatnam is invited to the references cited. They are informed that, by considering the reasons stated by the Pensioners’ Association in the reference 1st cited, Government have extended the time limit for obtaining of Annual Verification (Life) Certificates up to 15.04.2021, vide reference 2nd cited.
They are therefore requested to instruct all the STOs under their control to follow the above instructions scrupulously without any deviation.They are also requested to obtain the transactions details in respect of these pensioners(who have not submitted L.Cs till date) from the concerned banks and their mode of drawl at once for submission of a report to the Govt, as desired in the reference 2nd cited. The report should reach to the DTA office by 31.03.2021.
Any deviation of the above instructions will be viewed seriously.
(This has got the approval of the DTA)
Jeevan Pramaan App Download For Mobile – Jeevan Pramaan Life Certificate Download
AP TEACHERS LATEST UPDATES AP Teachers updates, government orders, AP TET, DSC, SA1 key papers, textbook solutions and free school tools.